BuildOUT California is proud to amplify the information provided below by Tutor Perini regarding their two upcoming DBE Outreach events for the East San Fernando Valley Light Rail Project!
When: 9:00 a.m. or 2:00 p.m. Where: Thursday, September 1, 2022
Virtual Zoom Meeting (link provided once registration is complete)
To register, visit: https://www.eventbrite.com/o/tutor-perini-corporation-52334886623
Attention DBE Subcontractors & Suppliers:
Phase 1/Pre-Construction Services & Early Works Construction:
Survey, traffic control, utility potholing, geotechnical and drilling services, asphalt paving, engineering design services, printing services, janitorial services, office supplies, staffing services, office furniture, copy machine service.
Phase 2 – Design & Construction:
Scopes to be sent out at a later date.
Current Project Partners:
• Ayce – Roadways • Ma Engineering – Civil/Utilities • ARUP – Design • Gruen – Landscape Architecture • SENER – Line-Wide Systems/Track Support
To learn more about Tutor Perini, visit www.tutorperini.com
Comments